requirements documents, in practice,2

the project mentioned in the january post has by now progressed to the point where it can almost be considered finished. though it may be a touch pre-mature, i wanted to reflect on how my organized requirements-based approach worked and the results.

since we were given very little time to get the system into production (about 10 weeks), i made the decision that we would code a chunk of the project (let's say each chunk was one tenth of the programming required) after requirements for that one chunk were compiled and signed off on. this meant that chunk one could be coded before the requirements for chunk three were even created.

the idea was that the requirements gathering and documentation for chunk two could happen while chunk one was being coded. however, since i was doing most of the coding and most of the requirements documentation, these two processes were not exactly in parallel.

i decided on this approach because i felt that gathering and documenting all the requirements up front, and creating necessary mock-ups, would take longer than we had and that later requirements would most likely change a lot once the earlier requirements were coded. however, the universal wisdom is that having fully designed and gathered reqs at this stage would have yielded a better software product- better written, more readable, more robust, easier to maintain, etc. the current project really has none of these qualities because it was created in this add-on, add-on, add-on process.

the benefits:

- done fairly quickly. we stuck to the 10 week schedule fairly well.

the drawbacks:

- i spent a lot of time changing the reqs (ms word) documents, adding notes saying when/who signed off, and uploading them to the server for everyone to see. in the future i would design a more efficient system for this- probably a web form.

- i never developed a good system for documenting post-sign-off changes. though all reqs are signed-off on and coded, changes are still being requested. at this point, i am not going to create new reqs docs. instead i am just asking for emails that request the changes, i print these off, and do the coding. if i could have numbered these and posted online like with a bug-tracking web site, i could have kept a better handle on them. as it is, some are slipping through the cracks.

- as mentioned already, this approach resulted in a badly designed software project. this project was hard-coded for a specific group of people and now that another group wants to use it, it cannot be expanded to incorporate them but instead will have to be copied over and the second instance altered to handle this second group. had it been well designed and scalable, it would have been able to incorporate this group.

- it will be difficult to maintain. i explained to the "stake-holders" that since we rushed the development of the project, there will be a lot that it cannot do. when they want to request a new feature, we can only add that feature by changing the code and, once in production, this requires getting "change management" approval which takes several weeks.

all in all, it is dissappointing that i am forced to program in this haphazard way when i am capable of producing a good product that could last years if given time to develop it. i took as organized an approach as i could given the circumstances and the opposition and had i not tried, this project would still be being developed and re-written, developed and re-written, and not near finished.